20 x 55sqm HOUSES CAN BE
COMPLETED EVERY WEEK

COMPLETELY WATERPROOF

FIRE RESISTANT

COOL IN SUMMER
WARM IN WINTER

ULTRA DURABLE

30% LESS COST

The demand for fast, more affordable and energy efficient methods in construction has given rise to a more efficient and cost effective home construction technology.

Khaya is a brickless building system that produces a waterproof, insulated house that is faster than conventional construction and about 30% cheaper. Ideal for large housing projects where 1000 houses can be completed within a year. Achieve lock-up in days, not months. Khaya Homes is less reliant on highly skilled trades and materials vs traditional construction and is future-proofed against trade and numerous material price escalations.

This is what
a completed
Khaya Home
looks like

The Khaya method of construction can be implemented into any one of the following markets:

01
AFFORDABLE HOUSING
  • Achieve lock-up in weeks, not months
  • Schedules are less affected by bad weather
  • Build with less trades and less logistical issues
  • Build more homes each year
  • Less reliance on highly skilled trades and materials
02
RETIREMENT HOMES
  • Completely waterproof and fire resistant
  • Walls and roof are well insulated
  • Any type of roof or window can be installed within the Khaya walls
  • Walls are completely mold and damp-free
  • Roof on within 5 days
03
STUDENT ACCOMMODATION
  • No noise transmission through the walls
  • All walls are plastered with a toughened plaster finish
  • All panels are supplied with pre-installed electrical and plumbing conduits
  • Certificates of compliance issued for structural integrity, fire safety and electrical infrastructure
  • 50 bed unit completed within a month
04
CLASSROOMS
  • No noise transmission through the walls
  • All walls are plastered with a toughened plaster finish
  • 50 classrooms completed within a month
  • Supplied with relevant roof trusses and roof sheeting
  • Supplied with aluminium windows and timber doors
05
COMMERCIAL TO RESIDENTIAL
  • Lighter load on the floor slab (52kg’s per sqm vs 480kg’s per sqm for bricks)
  • An entire floor can be completed and ready for rental within a month
  • No noise transmission through the walls
  • Less reliance on highly skilled trades and materials
  • All electrical and plumbing conduits supplied as per the projects specification